![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
For further information about RTCA contact: Rio
Tinto Coal Australia |
The Clermont Coal Mine Project Environmental Impact Statement (EIS) and Supplementary Report may be viewed and downloaded here (see tables of links below). As the EIS documents are so large, they have been separated into a number of pdf documents. However, it should be recognised that some of these pdfs may take some time to download. Volume 1 - EIS
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Volume 1 Cover |
|
| Table of Contents |
|
| Executive Summary |
|
| Glossary |
|
| 1 – Introduction |
|
| 2 – Description of the Project |
|
| 2 – Description of the Project – Figures: |
|
| Figure 2-1 |
|
| Figure 2-2 |
|
| Figure 2-3 |
|
| Figure 2-4 |
|
| Figure 2-5 |
|
| Figure 2-6 |
|
| Figure 2-7 |
|
| Figure 2-8 |
|
| Figure 2-9 |
|
| Figure 2-10 |
|
| Figure 2-11 |
|
| Figure 2-12 |
|
| Figure 2-13 |
|
| Figure 2-14 |
|
| Figure 2-15 |
|
| Figure 2-16 |
|
| Figure 2-17 |
|
| Figure 2-18 |
|
| 3 – Land Resources |
|
| 3 – Land Resources – Figures: |
|
| Figure 3-1 |
|
| Figure 3-2 |
|
| Figure 3-3 |
|
| Figure 3-4 |
|
| Figure 3-5 |
|
| Figure 3-6 |
|
| Figure 3-7 |
|
| Figure 3-8 |
|
| Figure 3-9 |
|
| 4 – Water Resources |
|
| Figure 4-1 |
|
| Figure 4-2 |
|
| Figure 4-4 |
|
| Figure 4-6 |
|
| Figure 4-8 |
|
| Figure 4-9 |
|
| Figure 4-10 |
|
| Figure 4-11 |
|
| Figure 4-12 |
|
| Figure 4-17 |
|
| Figure 4-18 |
|
| Figure 4-19 |
|
| Figure 4-20 |
|
| Figure 4-21 |
|
| Figure 4-22 |
|
| Figure 4-23 |
|
| Figure 4-25 |
|
| 5 – Nature Conservation |
|
| 6 – Air Quality |
|
| 7 – Noise and Vibration |
|
| 8 – Cultural Heritage |
|
| 9 – Scenic Values |
|
| 10 – Waste Management |
|
| 11 – Infrastructure and Traffic |
|
| Figure 11-1 |
|
| 12 – Community Consultation |
|
| 13 – Social Environment |
|
| 14 – Economic Impacts |
|
| 15 – Health and Safety |
|
| 16 – Draft EMOS |
|
| References |
| Volume 2 Cover |
|
| A – Approvals |
|
| B – Final terms of Reference |
|
| C – Research |
|
| D – Consultation |
|
| E – Study Team |
|
| F – List of Proponent Commitments |
|
| G – Land Resources |
|
| H – Groundwater |
|
| I – Surface Water Quality Summary Tables for Cement Hill Pit and Spring Creek |
|
| J – Final Void water Quality Model Inputs |
|
| K – Nature Conservation |
|
| L – Air Quality |
|
| M – Noise and Vibration |
|
| N – Social Environment – Supporting Information |
|
| O – Retail and Business Facilities in Clermont |
|
| P – Economic Modelling |
|
| Q – Corporate Health, Safety and Environmental Policy |
| Supplementary Report Front Cover |
|
| 1 – Introduction |
|
| 2 – Project Description |
|
| Figure_2-8.pdf 364KB |
|
| Figure_2-9.pdf 370KB |
|
| Figure_2-12.pdf 254KB |
|
| Figure_2-13.pdf 780KB |
|
| 3 – Air Quality |
|
| 4 – Noise and Vibration |
|
| 5 – Cultural Heritage Management Plan |
|
| 6 – Supplementary Response Table |
|
| Draft EMOS |
|
| figure_16-1.pdf 589KB |
|
| figure_16-2.pdf 432KB |
|
| References |
|
| Appendix A – Air Quality Appendices |
|
| Appendix B – Noise and Vibration Appendices |
|
| Appendix C – Additional Geochemistry | |
| Appendix D – Revised Figures | revised_Figure_2-5.pdf 554KB |
| revised_Figure_2-6.pdf 566KB | |
| revised_Figure_2-7.pdf 567KB | |
| revised_Figure_2-8.pdf 590KB | |
| revised_Figure_2-9.pdf 595KB | |
| revised_Figure_2-10.pdf 599KB | |
| revised_Figure_3-5.pdf 337KB | |
| revised_Figure_3-6.pdf 364KB | |
| revised_Figure_4-8.pdf 454KB | |
| revised_Figure_4-9.pdf 407KB | |
| revised_Figure_5-4.pdf 519KB | |
| Figure_11-1.pdf 540KB | |
| Appendix E – Final Dump Landform | Appendix_E.pdf 210 KB |
| Appendix F – Final Void | |
| Appendix G – Revised Traffic Volumes | |
| Appendix H – Project Commitments | |
| Appendix I – Surplus Groundwater and Sandy Creek Alluvial Aquifer Water Quality | |
| Appendix J – Summary of Surface Water Quality | |
| Appendix K – Summary of Accommodation Providers | |
| Supplementary Report Back Cover |
RTCA-Sup_back_cover.pdf 209KB |